0803-9043000
mully@sccnig.com
Plot 741 Cadastral Zone B16, Asuquo J. Okun Street
Taraba State.
Construction of 137Km asphalt road, Box culverts, 11No. Bridges of up to 100m in span.
Construction of 60,000m3/day Water Treatment plant consisting of Clear Water Tank, Clarifier, Aerators and Filter Beds.
Construction of Dam and associated structures, with outlets for future Water Treatment Plant, Irrigation and Hydro Power Station.
Construction of Earth Dam and Clearing of about 2000Ha of irrigation area, Laying of Various sizes of pipeline and Construction of irrigation channels including access roads.
Construction of the 315Mm3 Dam, spillway, Intake Structure, and Access Road.
Construction of 500Mm3 capacity Dam and associated structures, Construction of Water Treatment Plant, Laying of 95km pipeline for Water Supply, Construction of Center Pivot Irrigation system, Construction of 40MW Hydro Power Station and Airstrip.
Construction of 120Km Roads networks of various sizes, Water Pipelines, Elect/Telecom network, Street Lightning, Storm Water drainages and Culverts
Clearing of 4,000Ha of irrigation area, construction of access roads, Laying of various sizes of pipelines, installation of Center Pivot Irrigation system.
Construction of 234Km asphalt road, Construction of Hydraulic structures (Culverts and Bridges), provision of Solar Powered Light along the road, rehabilitation of concrete structures and slope protection.
Construction of 80km Roads networks of various sizes, Culverts, Laying of Sewer pipelines, Water Pipelines, Elect/Telecom networks, Street Lightning and Storm Water drainages.
Construction of 40Km Roads network of various sizes, Bridges, Culverts, Drainages, Laying of Sewer pipelines, Water supply Pipelines, Electrical and Telecommunication networks and Street Lightning.
FCT Abuja
Rehabilitation of Existing Sewer line and Construction of 13km of Concrete Interceptor Sewer pipelines
Construction of a bridge of 80m in length with four (4) equal spans of 20m each and Asphalt works.
Construction of 75Km Single Carriageway Road including 5 Bridges, Culverts and Drains and associated structures
onstruction of 92Km asphalt road, Hydraulic Structures (Culverts and Bridges)
Construction of Switchyard, Substations of various capacities, Line Bays, 245Km of Transmission Lines including the Steel Lattice Structures.
Construction of 700,000 PE capacity Sewage Treatment plant comprising Aerators, Screens, Clarifiers, Lagoon and Buildings
Production and laying of 74 km of 3000mm diameter Steel Pipeline, Construction of valve chambers, building, and 75km service road.